Plymouth Planning Board Backs Cherry Street Gas Station With Environmental Conditions
PLYMOUTH — January 14, 2026 — Plymouth Planning Board recommends approval of Cherry Street gas station and convenience store, with conditions. The board voted 4-0-1 Wednesday to advise the Zoning Board of Appeals to approve a special permit for T.L. Edwards, Inc. to build a 6,000-square-foot convenience store with 12 fuel pumps and a drive-through at 360 Cherry Street, with Chair Steven Bolotin abstaining because the town engineering department's review — containing five general comments, 12 drainage comments, four transportation comments, and 12 water and sewer comments — arrived after the board's packets and was not fully before members. Planning Director Lauren Lind confirmed no tobacco licenses are available in Plymouth, barring tobacco sales at the site, and recommended approval subject to standard conditions. The board added its own requirements, including groundwater monitoring consideration, bollards at building entrances, additional crosswalks and pavement striping, and enhanced do-not-enter signage at the Commerce Way right-turn-only driveway. The project goes to the ZBA on January 26.
Keep reading with a 14-day free trial
Subscribe to The Plymouth MA Post to keep reading this post and get 14 days of free access to the full post archives.
A subscription gets you:
- Subscriber-only posts and full archive
- Post comments and join the community
- 24x7 access to local news